A major inspection is a detailed equipment-specific assessment which may involve dismantling, NDT and engineering review. Its timing and extent follow the actual machine, records and applicable requirements.
A major inspection is a detailed equipment-specific assessment which may involve dismantling, NDT and engineering review. Its timing and extent follow the actual machine, records and applicable requirements.
NDT Australia provides a single enquiry and co-ordination point for industrial inspection through specialist partners. The proposed provider, personnel competence, method-specific qualifications where required, insurance and any separate approval requirements are checked for the actual scope before appointment; no general accreditation or acceptance guarantee is implied.
Cranes and EWPs need serial identification, configuration, manufacturer guidance, design-life information, duty history and records of repairs or modifications.
Critical components are identified, made accessible and examined using suitable visual, surface and ultrasonic techniques. Findings, repairs and any repeat examinations are tracked through the agreed review process.
Ten years is not a universal deadline or an automatic extension of life. Missing records or inaccessible parts can prevent a conclusion. Certification, design-life review and return-to-service decisions are not automatic NDT outputs.
Agree the inspection basis, dismantling responsibilities, replacement-parts interfaces and review hold points before booking the outage. Confirm the relevant parts of AS 2550/AS 1418 and manufacturer requirements for the machine.
Expect a traceable examination pack, component references, dismantling/access exclusions, findings and repair/re-test history. Any responsible engineer's assessment is separately commissioned and attributed.
construction inspection planning
Major Inspection is applied across a wide range of assets and industries, including:
The references below are planning context, not a claim of accreditation, certified compliance or a universal acceptance rule. Confirm the applicable edition, part, material, procedure and acceptance criteria for this asset. Verify the appointed personnel's method, level and sector competence, insurance and any engineering authority required for the scope before work. A method standard is not itself a return-to-service approval.
Explore complementary inspection scopes. Method, specialist partner and availability are confirmed for the asset and location.