Magnetic particle inspection, also called MT or magnetic particle testing, uses a magnetic field and particles to reveal surface and some near-surface discontinuities.
Magnetic particle inspection, also called MT or magnetic particle testing, uses a magnetic field and particles to reveal surface and some near-surface discontinuities.
NDT Australia provides a single enquiry and co-ordination point for industrial inspection through specialist partners. The proposed provider, personnel competence, method-specific qualifications where required, insurance and any separate approval requirements are checked for the actual scope before appointment; no general accreditation or acceptance guarantee is implied.
Ferromagnetic steel welds, castings, forgings and selected lifting or machinery components are candidates. Aluminium and most austenitic stainless steels need a different method.
Magnetisation direction, surface preparation, particle system and viewing conditions are selected for the examination. More than one field direction may be needed to address likely crack orientations.
MPI is principally a surface method, not a view through an entire weld. Paint, rough profiles and geometry can reduce sensitivity or produce non-relevant indications; cleaning and demagnetisation requirements are agreed where needed.
Identify material, access, coating removal restrictions and the areas of concern. Include a repair history so the inspection can distinguish a new response from an already documented location.
Expect component or weld references, technique and field arrangement, examination extent, indication locations, evaluation criteria and any preparation or viewing limitations.
construction inspection planning
manufacturing inspection planning
Magnetic Particle Inspection is applied across a wide range of assets and industries, including:
The references below are planning context, not a claim of accreditation, certified compliance or a universal acceptance rule. Confirm the applicable edition, part, material, procedure and acceptance criteria for this asset. Verify the appointed personnel's method, level and sector competence, insurance and any engineering authority required for the scope before work. A method standard is not itself a return-to-service approval.
Explore complementary inspection scopes. Method, specialist partner and availability are confirmed for the asset and location.