Resource

When to Inspect: A Timing Guide

Guidance on when different types of equipment and structures should be inspected.

Overview

Inspection timing depends on the equipment, its duty, service history, manufacturer instructions, jurisdiction and applicable standard. The triggers below are planning prompts, not a universal interval or a substitute for a current inspection program.

Typical Inspection Triggers

  • EWPs — routine, annual and 10-year major inspection
  • Cranes — routine, periodic and major inspection per AS 2550
  • Pressure equipment — periodic in-service inspection per AS 3788
  • Structural steel — during fabrication, at handover, and in service
  • After any overload, impact or incident
  • When defects or corrosion are suspected

Events That Change the Scope

  • A repair, modification, replacement or change of duty
  • Overload, collision, dropped load, abnormal movement or other incident
  • A new indication, leak, unexpected thickness loss or change in operating condition
  • A long period out of service followed by recommissioning
  • A change in the applicable requirement, owner risk assessment or manufacturer instruction

Choosing an Interval

Use prior findings and repeatable measurements to trend condition, but do not extrapolate a remaining-life decision from a single reading. Corrosion rate, fatigue behaviour, access and consequence of failure all affect the interval. A competent person or responsible engineer should confirm the inspection plan where the result could affect continued operation.

Frequently Asked Questions

Guidance on when different types of equipment and structures should be inspected. Contact our team on 0416 689 689 to discuss the equipment, location and inspection scope.

Related Services

Explore complementary inspection scopes. Method, specialist partner and availability are confirmed for the asset and location.