Common Mistakes

EWP & Cherry Picker Inspection Mistakes to Avoid

Common elevated work platform inspection mistakes — and why AS 2550.10 compliance needs certified NDT, not a quick look-over.

Overview

Elevated work platforms carry people, not just loads — which is why the standards around them are strict and the consequences of shortcuts are severe.

From hire fleets to owner-operators, these are the EWP inspection mistakes we see most, and how professional inspection protects your people and your business.

The Most Common Mistakes

  • Believing the logbook stamp covers you — a stamp without genuine NDT of critical welds is paperwork, not safety
  • Skipping the 10-year major inspection because the machine 'still works'
  • Missing cracks at boom pivots, knuckles and turret welds — classic fatigue points that need MPI or dye penetrant
  • Painting over defects — fresh paint hides cracks and voids meaningful visual inspection
  • Buying a used EWP without an independent pre-purchase inspection
  • Assuming the hire company handled it — as the operator of plant, you still hold WHS duties

What These Mistakes Cost

A boom or basket failure at height is usually catastrophic. Short of that: machines pulled off hire, failed audits, void warranties and insurance disputes when the inspection history doesn't hold up.

The 10-year major inspection under AS 2550.10 is not optional — and it must be thorough enough to be defensible, including NDT of critical structural welds.

Why Use an Appropriate Inspection Scope

  • Method-specific crack detection on booms, knuckles, pivots and chassis welds
  • Major-inspection support with AS 2550.10 considered where applicable
  • Defect photos, locations and clear repair recommendations
  • Reports recording scope, observations, relevant indications and limitations
  • Mobile attendance arranged around access, location and agreed scope

Frequently Asked Questions

Timing depends on equipment age, manufacturer instructions, service history, duty, modifications, condition and applicable requirements. Review the records with the responsible competent person rather than relying on age alone.

NDT may form part of a major inspection where the scope identifies structural details or suspected defect types that require it. The method and coverage should be selected for the material, geometry, access and applicable inspection plan.

Related Services

Explore complementary inspection scopes. Method, specialist partner and availability are confirmed for the asset and location.